NESHAP Renewal for Integrated Iron and Steel Manufacturing

The NESHAP for Integrated Iron and Steel Manufacturing are subject to the General Provisions of the NESHAP at 40 CFR part 63, subpart A, and any changes, or additions to the Provisions specified at 40 CFR part 63, subpart FFFFF.

Owners or operators of the affected facilities must submit initial notification, performance tests, and periodic reports and results. Owners or operators are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. Reports, at a minimum, are required semiannually.

Dates: This ICR is schedule to expire on August 31, 2012. Under OMB regulations, the Agency may continue to conduct or sponsor the collection of information while this submission is pending at OMB.

http://www.gpo.gov/fdsys/pkg/FR-2012-08-06/pdf/2012-19121.pdf